
EcoFlow connection for apartments and houses in Kyiv
What can be connected to EcoFlow
Backup power for selected apartment lines
We will connect an EcoFlow power station directly to the electrical panel so that selected lines of your apartment work during power outages.
For example:
- Fridge
- Lighting
- Wi-Fi router and network equipment
- Computer and workstation
- Other compatible electrical appliances
We determine the list of lines and the permissible load after inspecting the panel and taking your station's specifications into account.
Agree the connectionDo you have a private house or a commercial property? We will consider your task individually.
Discuss a projectWe connect EcoFlow DELTA and RIVER series
We work with EcoFlow stations of different series. Connection options and system configuration depend on the station model, its specifications and the condition of the electrical panel.
Connection diagram
How the backup power system works
Study the diagram to see how the station powers the selected lines of your apartment.
STEP 1 / 4
Apartment electrical panel
We check the existing wiring, circuit breakers and connection options.
-
We check the existing wiring, circuit breakers and connection options.
-
We provide the necessary protective devices and solutions for safe switching between power sources.
-
The station provides backup power within its technical capabilities.
-
During a blackout the selected lines connected according to the agreed scheme keep working.
The diagram is illustrative. The final decision on connection, protection and power switching is made by the engineer after inspecting the property.
Service
What the installation service includes
- Engineer visit
- Electrical panel inspection
- Checking whether a connection is possible
- Selecting the required protective devices
- Installation of a separate group and switching devices according to the agreed scheme
- EcoFlow connection
- Testing the system under load
- Issuing the work completion certificate
The scope of work and required materials are agreed before installation.
How the connection works
-
You submit a request
We call you and clarify the EcoFlow model, the type of property and your needs.
-
We inspect the electrical panel
We assess the condition of the panel and whether a connection is possible. If needed, we agree an engineer visit.
-
We agree the solution
We explain which lines can be connected, which materials are needed and how much the work will cost.
-
We install and test
We carry out the agreed work, check the system and issue a work completion certificate.
Safety and warranty
-
Warranty on installation work
The terms and duration of the warranty are agreed before the work.
-
Work completion certificate
Confirmation of the completed installation.
-
Preliminary approval
You know the scope of work and the cost before installation starts.
-
Check after installation
We check the system within the agreed scheme and permissible load.
Case studies
-
Ecoflow Delta 2 MAX
Kyiv, Holosiivskyi district
-
Ecoflow Delta 2
Kyiv, Solomianskyi district
-
Ecoflow Delta 2 MAX
Kyiv, Pecherskyi district
-
Ecoflow Delta 2 MAX
Kyiv, Obolonskyi district
Request
Order EcoFlow connection in Kyiv and the region
Leave your contact details — we will clarify your task and help determine the next steps.
FAQ
FAQ
The cost depends on the design of the electrical panel, the number of lines, the protective devices required and the complexity of the installation. We give a preliminary estimate after clarifying the details and agree the final cost before work begins.
The duration depends on the condition of the panel and the complexity of the connection. We will give an estimate after assessing your property.
It depends on the property type, the connection method and the specific conditions. Before installation we clarify which requirements apply to your case.
Yes, in many cases it is possible. The final decision depends on the station model, the condition of the wiring and the panel design.
The terms and duration of the warranty on installation work are agreed before the work begins. The installation warranty and the manufacturer's warranty on the station are separate terms.
Yes, we can consider connecting a station bought from another seller. We need to know its exact model and check compatibility with the planned scheme.
The engineer will explain what changes are needed for a safe connection. Any additional work is agreed with you separately.
The warranty on the station is governed by the terms of the manufacturer or seller. The warranty on installation work is separate.
Prepare your apartment for power outages
We will connect EcoFlow to the electrical panel taking into account your needs and the capabilities of the electrical network.
EcoFlow DELTA
EcoFlow RIVER